That gives you a 5 1 4 in.
Running plumbing through floor joists.
With the joists running parallel to the.
The holes must follow a straight line across the floor and must ascend or descend so the pipe will be sloped 1 4 inch per foot.
During the layout stage plan to run the drainpipes parallel to the floor joists when possible.
An important step in running drain lines occurs on paper before the actual plumbing begins.
The kitchen had a low less than 8 feet ceiling to begin with and the sistering that we recently did with larger lumber took even more headroom away so i can t run the drain line below them.
So i have to go through.
Step 4 cut the holes.
The floor will need cutting out to accommodate the trap but the pipe will be above floor level or.
You also have to leave at least 2 in.
Lean how to notch a joist for pipes and cables if you need to run pipes or cables under a floor.
In the case of your 2 10 joists the maximum diameter is 35 64 in.
You can drill the holes anywhere along the length of the joist first photo.
Joists to get a waste out the other needed the tray to be kept as low as possible due to the elderly client.
Waste pipes through joists.
I will have to run my new tub drain in our 2nd floor bathroom through the joists.
Calculate the size and location of notches and holes in joists correctly.
Of solid wood between the top and bottom edges of the joist and the edges of any hole.
Area in the middle of the 2 10.
Notches can t be deeper than one sixth of the joist depth.
The holes will have to follow a straight line that goes across the floor and has to either go up or go down so the pipe has a slope.
Step 3 understand the joist slopes.
The hole cannot be larger than one third the depth of the joist so the maximum hole size for a 2 12 joist actual size 1 1 2 x 11 1 4 in is 3 3 4 in.
The slope should be about 1 4 for each foot of pipe.
When you run your pipes through a joist you will have to be careful with your work.
Diameter plenty big enough for running cable.
Use our calculator to ensure your holes and notches are in the right position and do not affect the structural integrity of the building.